Journal of Jianghan University(Natural Science Edition) ›› 2018, Vol. 46 ›› Issue (4): 363-367.doi: 10.16389/j.cnki.cn42-1737/n.2018.04.012

Previous Articles     Next Articles

Application of Pre-Strategy in Batch Finishing of Super High Rise Residential Building

XU Chang   

  1. China Railway Major Bridge Engineering Group Wuhan Real Estate Development Co. ,Ltd.,Wuhan 430056,Hubei,China
  • Online:2018-08-28 Published:2018-08-31

Abstract: Combined with the case of batch finishing of ultra high rise residential buildings project(golden bridge of the central iron century of Hanyang District in Wuhan),the author discussed the problems in traditional batch finishing,it had the defects such as inefficiency,need or use great effort,diseconomy. The traditional batch finishing and pre-strategy finishing were compared in this article. Then the author introduced the pre- strategy application into the real case,to solve the disadvantages of traditional batch finishing,and discussed the problems that need to pay attention on application of pre-strategy finishing. The application adapted to the situation of building market of fine finishing project,it provided an economical and effective way for real estate development companies to implement finishing projects.

Key words: pre-strategy, batch finishing, construction design

CLC Number: